Thanks to the synergy between unfired earth e hemp you can say goodbye to mould. You will literally forget what it is.
Mr Bianco came across Ton Gruppe® looking for a definitive solution to a serious problem that was afflicting some walls in his home: aggressive and persistent mould, to the point of making rooms unlivable.
Yes, you read that right, the ultimate solution.
The problem of mould is really recurring in modern buildings and it is often believed that the solutions on the market are only palliative. But this is not the case, the definitive solution exists and is called Kartonsan® dry construction system.
Below is the report written by the client himself on the history of the construction site, carried out in May 2012, the difficulties encountered, the solutions found and the result achieved.
Over the years, we have innovated the panels and installation solutions, making them even more effective and functional. The substance, however, does not change, the strength and properties of clay, a living and active material, combined with the insulating and transpiring power of hemp/jute are our solution to the mould problem.
KARTONSAN® DRYWALL SYSTEMTHE PRACTICAL CASE
by Bianco Ezio, owner of the house in Canelli (AT) - 2013
Status and site analysis
The single-family house in Piedmont was built in 2006-2007 and has sandwich walls, consisting of: two rows of hollow bricks sp.=12 cm, air space sp.=7 cm and generic insulation sp.=4 cm
Critical climatic conditions: Winter season with minimum temperatures ranging from -8° to -22°C.
Starting situation described by the customer: «WALL cold to the touch, localised mould in corners and on the ceiling near the wall. IT WAS NOT IMAGINABLE to put a bed or a wardrobe, a chair, toys or whatever you can think of near those walls (I repeat NEAR not ATTACHED)».
Intervention recommended, designed and supervised by arch. Franca Bagnulo, bio-building technique anab: Kartonsan® counterwall thickness 50+22 mm
The wooden frame was used FixBit® 50 mm, hemp insulation boards Canaton® (hemp 36 kg/m³) of 60 mm thickness compressed in laying, terracruda slabs Kartonsan® 22 mm thick and finished with Geosana® fine cream-white plaster.
INSTALLATION: KARTONSAN COUNTER-WALL THICKNESS
50+22 mm
The frame FixBit® is installed on the existing walls, using screws and/or fischers depending on the wall construction material. The spacing between the vertical posts is 62.5 cm. An additional frame must clearly be placed at windows and corners.
FixBit® is fixed following the geometry of the wall, edges and fixtures.
FixBit® is available for wall heights of 2.60 or 3.50 m. All other heights can be obtained by simply cutting the 3.50 m version.
Insulation is inserted Canaton®Due to its density, the panel is compressible and is inserted in such a way as to leave no gaps.
Laying the panel is quick and easy.
After laying the hemp insulation Canaton® continue by fixing the clay panel Kartonsan®.
This is done by means of the appropriate screws or by means of clips.
The panel is fixed at the frame of the FixBit®. In the case of wall units, an additional reinforcement batten must be provided at the attachment of these.
After the laying of the Kartonsan®, at sockets and connections, the panel can be easily cut and shaped.
.
This is the result at the end of the installation Kartonsan®.
Finished wall, plastered with Geosana® fine clay plaster creamy white colour, photos taken in 2013. The colour is uniform and in good condition.
The corners are mould-free and in excellent condition.
Cushions can now also be fixed to the wall without mould or moisture forming between them as was the case before.
The room that was previously unhealthy because of damp and mould can now be used as a children's bedroom.
CONSIDERATIONS ON THE INSTALLATION OF THE KARTONSAN® COUNTERWALL
Mr White's reviews of the pose:
«The laying of the hemp and the panels is not complicated, but I changed 2 masons to put on the skim coat; with the first one I wasted a lot of skim coat, with the second one it went enormously better.
Solutions
To overcome these laying problems, laying manuals have been created for both Kartonsan® than for plasters, which can be obtained from the technical office.
Free technical advice is also offered to instruct installers and contractors on the correct installation of all Ton Gruppe® products.
FINISHED WORK CONSIDERATIONS
Mr Bianco's review of the result:
«The walls seem much warmer, but never be fooled by the sensation to the touch, these are “fairground” arguments, what counts is the combination of the real temperature of the “skin” of the wall, the transmittance of the materials, the ability to lung, i.e. to ensure the right level of humidity along the wall and especially where it is and easier to have thermal bridges. IN FACT, before doing the work I feared that on the ceiling the thermal bridge would be sharpened and consequently mould would appear near the junction between the new wall and the ceiling, but fortunately this did not ABSOLUTELY happen, perhaps precisely because the new wall (made of natural material is HAD of humidity) absorbs excess vapour and returns it at the driest times, hence the term POLMONAR. Now I can put the head of the bed and even a flounce with two pillows hanging and directly in contact with the wall».
Thermal imaging results - Non-insulated walls
Considerable heat loss occurs through uninsulated walls
Thermal imaging results - insulated walls north of the house
The difference with uninsulated walls is remarkable, there is no heat loss
Defects found by Mr Bianco
«You cannot hang wall units unless you cross the laths, and then the surface is easily “scratched” as the clay is not as consistent as a traditional plaster.»
Solutions
If wall cabinets are to be installed, reinforcement strips must be provided at the hooks.
The plaster has been improved especially in the last year and is much stronger, in Mr Bianco's case it can be solved by using the fixative on the list.
Qualities found by Mr Bianco
«If you inadvertently scratch or stain the wall, just mix a few tablespoons of plaster with water in a small container, then spread it with a small spatula and level it off with a slightly hard sponge. Already done, great result’.
Value for money
«The material is not cheap, but only those who have problems with mould can understand that in such cases finding a permanent and natural solution (you sleep and live in bedrooms and chemistry is no good) is priceless!».
Mr Bianco's recommendations
«Rely on professional personnel, don't venture out on your own, especially when laying the plaster, which has no chemical additives and must be mixed correctly, laid once and not too often otherwise it will fall off. If you insist too much in one place, you run the risk of having part of the clay panels come into suspension and dirty the work. Remember that the skim coat is also at the same time the colour, if I dirty the skim coat then I see it. I would add that the clay panels must obviously be laid correctly without too many “steps”, otherwise it is then difficult to pass the skim coat evenly.
We have chosen to faithfully report Mr Bianco's review, as a matter of fairness and transparency. Since 2012, the year the work was carried out, we have innovated and many new technologies have been applied to the product, making it better, even in the laying aspects.
On all construction sites there are critical issues to be resolved, and those who work in construction know this.
What Ton Gruppe® aims to offer the customer is:
-
Comprehensive installation manuals
-
Comprehensive and up-to-date data sheets
-
Laying videos visible directly online from the company's YouTube channel
-
Continuous technical support, both by telephone from the office and on site through its technical consultants
-
Customised solutions designed through site and problem analysis
-
Ton Gruppe® also offers to instruct installers and contractors on the correct installation of its products
This is why the company is constantly updating and regularly produces documents and information.
We believe that perfection cannot be achieved, but we are convinced that we can and must continually strive to improve, through innovation and confrontation with the customer, be it a private individual, a technician or a company.